How long does the job take?
all jobs are different but a standard driveway replacement can take as little as a few days.
A new patio where there is existing grass or concrete that needs to be removed before pouring and then landscaped around after pouring and finishing can take 5 days
Allow us roughly 1-2 days for demolition and ground prep, 1 day for forming, 1 day to pour and finish it, and then 1+ days to clean up and landscape.
Is reinforcing my concrete with steel recommended?
Using steel rebar or wire mesh in any concrete flatwork will always increase the strength and rigidity but we wont always reccomended using steel since sometimes the risk of concrete breaking apart doesn't outweigh the price of steel. Steel generally does not help prevent cracking.
How long does concrete take to cure?
Concrete curing time depends on a lot of factors, air temperature, humidity, direct sunlight, use of calcium chloride, even a slight breeze can speed up curing time. On average, concrete fully cures in 28 days but is hard enough to walk on and use within just a couple of days.
How Can you get concrete into my backyard or a hard to access area?
With the use of concrete line pumps, boom pumps and wheel barrows We can get concrete just about anywhere. Boom pumps can safely extend right over the top of your entire house and precisely deliver concrete to your new back patio. line pumps can pump concrete wherever a 3 inch hose can fit, We use line pumps for interior jobs or if there is no safe area to setup a boom pump truck (usually because of uneven ground, powerlines, or just simply not enough room.
Will concrete leave a mess?
Concrete is extremely messy stuff, it's working in a pool of sticky, splattery, ultra permanent paint but we will never leave a mess behind.